Wind turbine blade on the ground next to a tower base and an excavator

Wind turbine decommissioning and dismantling

Dismantling of turbines and foundations, recycling and site restoration.

The end of a wind farm's life, handled responsibly

Lapa Recycling supports wind turbine owners, developers and municipalities throughout the end-of-life process: from estimating decommissioning costs to dismantling turbines and foundations, recycling the materials and restoring the site.

Wind turbine foundations are among the toughest structures there are. We demolish and remove or level out old steel-reinforced concrete foundations responsibly, by blasting where required.

Our strength is an extensive partner network across the Nordic countries, supported by technical specialists elsewhere in Europe. We select the most efficient methods for each project's location and requirements.

Contact us
Excavator breaking up a steel-reinforced concrete wind turbine foundation

From cost analysis to site restoration

  • 01

    Cost analysis

    We estimate the total cost: lifting, transport, dismantling, underground cables, material handling, recycling, scrap returns and site restoration.

  • 02

    Planning

    We prepare method statements and risk assessments for all work.

  • 03

    Dismantling

    Turbines are dismantled and foundations removed.

  • 04

    Recycling and restoration

    Materials are recycled, scrap is put out to competitive bidding and the site is restored.

Lapa Recycling

A responsible partner for the end of a turbine's life

Lapa Recycling started in 2022, when two engineers from different industries teamed up. Both have 15 years of experience in their field.

  • 1,000t

    Blade material recycled

  • 09

    Countries in Northern Europe

  • Top6%

    Kauppalehti Achievers 2025

Frequently asked questions

Can't find an answer? Contact us.

Can decommissioning costs be estimated in advance?

Yes. Our decommissioning cost analyses let municipalities and wind farm developers estimate the total cost of dismantling a wind farm as early as the permitting stage.

What does a decommissioning cost analysis cover?

The calculations cover lifting operations, transport, dismantling, underground cable excavation, material handling, recycling, potential material recovery, scrap returns and site restoration.

How are the foundations demolished?

Steel-reinforced concrete foundations are demolished and removed or levelled out. Where required, the demolition is carried out by blasting.

How is safety handled?

We carry out our work in accordance with rigorous quality and HSE requirements. We prepare comprehensive method statements and risk assessments for all work and document every stage.

How do we get the best value for the scrap?

We arrange competitive bidding for scrap materials to help you secure the best possible return from the recovered materials.

Is the site restored after dismantling?

Yes. Site restoration is part of our service and included in the decommissioning cost analysis.

Service area

Nine countries. One responsible partner.

From our headquarters in Jyväskylä, Finland, we serve wind farms in nine countries across Northern Europe.

Map of Lapa Recycling's service area: Finland, Sweden, Norway, Denmark, Germany, Poland, Lithuania, Latvia and Estonia

Other services

Consulting

Decommissioning cost analyses

We also provide consulting: our decommissioning cost analyses let municipalities and wind farm developers estimate the total cost of dismantling a wind farm as early as the permitting stage.

Ask about consulting